Removal Procedure
- Remove the right instrument panel (I/P) insulator. Refer to 
Instrument Panel Insulator Panel Replacement - Right Side 
 in Instrument
Panel, Gages, and Console.
 
- Remove the I/P compartment. Refer to 
Instrument Panel Compartment Replacement 
 in Instrument Panel, Gages, and
Console.
 
- Remove the screws that secure the recirculation actuator to the HVAC module
assembly.
 
- Remove the recirculation actuator from the HVAC module assembly.
 
- Disconnect the electrical connector from the recirculation actuator.
 
Installation Procedure
- Position the recirculation actuator, aligning the slots in the electric
actuator drive to the flats on the shaft.
 
- Align the locating hole to the alignment pin on the HVAC module assembly.
 
- Slide the actuator drive completely onto the shaft, with the mounting
holes flush with the mounting screw holes on the HVAC module assembly.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the screws to the recirculation actuator.
 
Tighten
Tighten the screws to 1.5 N·m (13 lb in).
- Connect the electrical connector to the recirculation actuator.
 
- Install the I/P compartment. Refer to 
Instrument Panel Compartment Replacement 
 in Instrument Panel, Gages, and
Console.
 
- Install the right I/P insulator. Refer to 
Instrument Panel Insulator Panel Replacement - Right Side 
 in Instrument Panel, Gages,
and Console.
 
- Calibrate the actuator. Refer to 
Actuator Recalibration 
 .