Tools Required
|     •  | J 25025-B 
 Dial Indicator Post and Guide Pin Set | 
 
Notice: If the front end play check procedures are not closely followed, you
may select an incorrect selective thrust washer thickness. This could result
in severe damage to the internal transmission components.
- Assemble the 
J 25025-B 
 by attaching the threaded rod and the dial indicator holder to one of the bolt holes on the transmission case assembly (7).
 
- Assemble the 
J 8001-3 
 onto the dial indicator holder. Index the 
J 8001-3 
 to the end of the turbine shaft (502).
 
- Eliminate any slack by pressing down on the turbine shaft (502).
 
- Using 
J 28585 
 , apply upward pressure on the output carrier assembly to remove free play in the retainer ring.
 
- Set the 
J 8001-3 
 to 0.
 
- Pull up on the turbine shaft (502) while holding up the output carrier assembly with the 
J 28585 
 .
 
End Play Specification
The correct end play is 0.102-0.559 mm (0.004-0.022 in).
- Remove the tools from the transmission.
 
- If the front end play measurement is incorrect, refer to the 
Overrun Clutch Housing Selective Thrust Washer Specifications
 . Choose a new selective thrust washer based on the original selective washer and
the information contained in the table.
 
- Correct the end play by changing the overrun clutch housing selective thrust washer.