Removal Procedure
- Remove
the left side end   panel.
 
- Remove the knee bolster. Refer to 
Knee Bolster Replacement 
  in Instrument Panel, Gages and Console.
 
- Disconnect all the wiring connectors from the fuse block.
 
- Remove all the fuses.
 
- Remove the turn signal relay from the back of the fuse block.
 
- From behind the fuse block, remove the retaining bolt.
 
- Insert a screw driver between the fuse block and the wire harness  block
to separate.
 
- Push on the retainers in order to remove the fuse block.
 
- Remove the fuse block from the vehicle.
 
Installation Procedure
- Install the fuse block onto the I/P assembly until it clicks in  place.
 
- Install the wire harness block to the back of the fuse block.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the bolt.
 
Tighten
Tighten the bolt to 6 N·m (53 lb in).
- Install the turn signal relay to the back of the fuse block.
 
- Using the wiring diagram on the cover of the fuse panel, install  the
fuses.
 
- Install the electrical connectors.
 
- Install the knee bolster. Refer to 
Knee Bolster Replacement 
  in Instrument Panel, Gages and Console.
 
- Install
the left side  end panel.