Intake Manifold Installation RPO LC9/LY5/LMG/L76
                    
Note: 
|    •  | The intake manifold, throttle body, fuel injection rail, and fuel injectors may be removed as an assembly. If not servicing the individual components, install the intake manifold as a complete assembly. | 
 
|    •  | DO NOT use the intake manifold gaskets again. Install NEW intake manifold-to-cylinder head gaskets. | 
 
- Install NEW intake manifold-to-cylinder head gaskets (514).
 
- Install the intake manifold (500).
 
- Apply a 5 mm (0.20 in) band of threadlock GM P/N 12345382 (Canadian P/N 10953489) to the threads of the intake manifold bolts (512). Refer to 
Adhesives, Fluids, Lubricants, and Sealers.
 
Caution: Refer to Fastener Caution in the Preface section.
- Install the intake manifold bolts.
 
| 4.1.  | Tighten the intake manifold bolts (1-10) a first pass in sequence to 
5 N·m (44 lb in). | 
 
| 4.2.  | Tighten the intake manifold bolts (1-10) a final pass in sequence to 
10 N·m (89 lb in). | 
 
- Install the fuel rail. Refer to 
Fuel Rail and Injectors Installation.
 
- Lubricate the manifold absolute pressure (MAP) sensor grommet (715) with clean engine oil.
 
- Install the grommet onto the MAP sensor (714).
 
- Install the MAP sensor and retainer (736).
 
- Install the positive crankcase ventilation (PCV)
hose - dirty air (716).
 
                            Intake Manifold Installation RPO LY2/LY6/L9H
                    
Note: 
|    •  | The intake manifold, throttle body, fuel injection rail, and fuel injectors may be removed as an assembly. If not servicing the individual components, install the intake manifold as a complete assembly. | 
 
|    •  | DO NOT use the intake manifold gaskets again. Install NEW intake manifold-to-cylinder head gaskets. | 
 
- Install NEW intake manifold-to-cylinder head gaskets (514).
 
- Install the intake manifold (500).
 
- Apply a 5 mm (0.20 in) band of threadlock GM P/N 12345382 (Canadian P/N 10953489) to the threads of the intake manifold bolts (512). Refer to 
Adhesives, Fluids, Lubricants, and Sealers.
 
Caution: Refer to Fastener Caution in the Preface section.
- Install the intake manifold bolts.
 
| 4.1.  | Tighten the intake manifold bolts (1-10) a first pass in sequence to 
5 N·m (44 lb in). | 
 
| 4.2.  | Tighten the intake manifold bolts (1-10) a final pass in sequence to 
10 N·m (89 lb in). | 
 
- Install the fuel rail. Refer to 
Fuel Rail and Injectors Installation.
 
- Lubricate the manifold absolute pressure (MAP) sensor grommet (715) with clean engine oil.
 
- Install the grommet onto the MAP sensor (714).
 
- Install the MAP sensor and retainer (736).
 
- Install the positive crankcase ventilation (PCV)
hose - dirty air (716).