- Install the engine to the front frame.
 
- Ensure that all the hoses, wires, pipes, and shock modules are positioned out of the way to avoid contact during engine installation.
 
- With the aid of an assistant, raise the table and/or lower the vehicle to install the engine, front frame, fuel/brake bundle, and front suspension.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the frame bolts.
 
Tighten
Tighten the frame bolts to 191 N·m (141 lb ft).
- Install the right and left upper shock modules bolts.
 
Tighten
Tighten the bolts to 112 N·m (83 lb ft).
- If the vehicle is equipped with Magnaride, connect the shock module electrical connectors.
 
- Connect the heater inlet hose to the water housing.
 
- Connect the heater outlet hose to the outlet pipe.
 
- Raise the vehicle.
 
- Install the fuel and brake line bundle bracket to the right side wheelhouse.
 
Tighten
Tighten the bracket bolt to 9 N·m (80 lb in).
- Install the fuel filter bracket bolt.
 
Tighten
Tighten the bracket bolt to 9 N·m (80 lb in).
- Install the fuel and brake line to the bundle brackets, the length of the vehicle.
 
- Install the rear brake line to the bracket bolt above the rear axle assembly.
 
Tighten
Tighten the bracket bolt to 9 N·m (80 lb in).
- Connect the EVAP hose to the rear of the fuel filter.
 
- Connect the fuel line to the fuel filter.
 
- Install the brake lines to the bundle clips on the right and left frame rails.
 
- Install the transmission assembly. Refer to 
Transmission Replacement
 or 
Transmission Replacement
 .
 
- Install the transfer case, if equipped. Refer to 
Transfer Case Assembly Replacement
 .
 
- Install the powers steering oil cooler to the mounting bracket. Refer to 
Power Steering Fluid Cooler Replacement
 .
 
- Lower the vehicle.
 
- Install the radiator, condenser, and transmission oil cooler as an assembly. Refer to 
Radiator Replacement
 and 
Condenser Replacement
 .
 
- Raise the vehicle.
 
- Install the bolt that secures the power steering to the radiator.
 
Tighten
Tighten the bolt to 9 N·m (80 lb in).
- Connect the center intermediate shaft to the lower intermediate shaft.
 
- Install the bolt (3) that secures the 2 shafts.
 
Tighten
Tighten the bolt to 30 N·m (23 lb ft).
- Working through the left wheelhouse, connect the transmission oil cooler lines near the air conditioning compressor.
 
- Working through the right hand wheelhouse, install the bolt which secures the washer fluid reservoir to the front frame brace.
 
Tighten
Tighten the bolt to 6 N·m (53 lb in).
- Install the right and left front wheelhouse liners. Refer to 
Wheelhouse Panel Replacement - Right Side
 and 
Wheelhouse Panel Replacement - Left Side
.
 
- Install the right and left wheelhouse splash shields. Refer to 
Wheelhouse Splash Shield Replacement
 .
 
- Install the right and left front tire assemblies. Refer to 
Tire and Wheel Removal and Installation
 .
 
- Lower the vehicle.
 
- Install the cooling fan. Refer to 
Engine Cooling Fan Replacement
 .
 
- Connect the electrical connector C113 at the right hand frame rail. Refer to 
Underhood Electrical Center or Junction Block Replacement
 .
 
- Connect the electrical connector C5 to the underhood bussed electrical center. Refer to 
Underhood Electrical Center or Junction Block Replacement
 .
 
- For the 5L50-E transmission only, connect the transmission control module. Refer to 
Transmission Control Module Replacement
 .
 
- Connect the chassis electrical connector located at the top of the right hand shock tower.
 
- Install the positive battery cable to the underhood bussed electrical center. 
 
Tighten
Tighten the battery cable nut to 15 N·m (11 lb ft).
- Install the negative battery cable retainer and bolt to the right hand shock tower. 
 
Tighten
Tighten the retainer bolt to 36 N·m (27 lb ft).
- Install the underhood electrical center cover.
 
- Connect the underhood fuse block connector C5.
 
- Connect the front of the dash electrical connector C102. Refer to 
Harness Routing Views
 .
 
- Install the fuel line retainer located on the bracket attached to the heater lines on the front of the dash.
 
- Install the brake master cylinder.
 
Tighten
Tighten the retaining nuts to 25 N·m (18 lb ft).
- Connect the brake fluid level switch.
 
- Connect the brake booster vacuum line to the brake booster.
 
- Install the air conditioning liquid line to the condenser. Refer to 
Liquid Line Replacement
 .
 
- Install the air conditioning suction hose located at the top of the left hand shock tower (1). Refer to 
Suction Hose Replacement
 .
 
- Install the air conditioning liquid and suction lines to the retaining feature on the fan shroud.
 
- Connect the coolant surge tank hose to the radiator.
 
- Install the air cleaner assembly. Refer to 
Air Cleaner Assembly Replacement
 .
 
- Install the fuel injector sight shield. Refer to 
Fuel Injector Sight Shield Replacement
 .
 
- Install the cross vehicle brace. Refer to 
Cross Vehicle Brace Replacement
 .
 
- Install the positive battery cable. Refer to 
Battery Positive Cable Replacement
 .
 
- Install the negative battery cable. Refer to 
Battery Negative Cable Disconnection and Connection
 .
 
- Remove 
J 42640 
 . Refer to 
Lower Intermediate Steering Shaft Replacement
 .
 
- Fill the engine with engine oil. Refer to 
Engine Oil and Oil Filter Replacement
 .
 
- Fill the cooling system. Refer to 
Refrigerant Recovery and Recharging
 .
 
- Recharge the air conditioning system. Refer to 
Refrigerant Recovery and Recharging
 .
 
- Bleed the brake system. Refer to 
Hydraulic Brake System Bleeding
 .