Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
DEFINITION: The rear blower does not operate at any speed.  | ||||
1  | 
 Install the Scan Tool . Is the rear integration module (RIM) requesting operation of the rear blower?  | --  | Go to Step 2  | Go to Step 5  | 
2  | Measure voltage at the rear blower motor terminal A. Is voltage measured greater then the specified value?  | 10.5 V  | Go to Step 6  | Go to Step 3  | 
3  | Measure voltage between RR BLO relay terminal E8 and ground. Is voltage at specified value?  | 0 V  | Go to Step 11  | Go to Step 4  | 
4  | Inspect CKT 1592 (TAN) for an open. Was an open condition repaired in CKT 1592 (TAN)?  | 12 V  | Go to Step 12  | Go to Step 9  | 
5  | Measure voltage at terminal J of the rear blower switch and ground. Is voltage measured greater than the specified value?  | 10.5 V  | Go to Step 7  | Go to Step 6  | 
6  | Check CKT 1052 (ORN) for an open. Was an open repaired in CKT 1052 (ORN)?  | --  | Go to Step 12  | Go to Step 8  | 
7  | Measure voltage between rear blower motor switch terminal A and ground. Is voltage greater than the specified value?  | 10.5 V  | Go to Step 9  | Go to Step 10  | 
8  | Inspect CKT 350 (BLK) for an open condition. Was an open condition repaired?  | --  | Go to Step 12  | --  | 
9  | Replace rear integration module (RIM). Refer to Body Control Module Replacement in Body Control Systems. Is the repair complete?  | --  | Go to Step 12  | --  | 
10  | Replace the rear blower switch. Is the repair complete?  | --  | Go to Step 12  | --  | 
11  | Replace the RR BLO relay. Is the repair complete?  | --  | Go to Step 12  | --  | 
12  | Confirm proper operation of the rear blower motor. Is the rear blower motor operation correctly?  | --  | System OK  | --  |