Rear Door Check Link Replacement Cargo Door
                    
Removal Procedure
- Open the door.
 
- Remove the trim panel. Refer to 
Door Trim Panel Replacement 
.
 
- Remove the water deflector.
 
- Remove the check link
 from the check link mounting bracket by lifting upward to release.
 
Important: Remove the one screw that retains the check link lock spring, if replacing
 just the check link lock spring. When replacing the check link bracket all
 three  screws will need to be removed. Remove one screw at a time when replacing
  the check link bracket. If all three screws are removed at once this may
 cause  the loss of the threaded anchor plate. If this occurs,  remove the
  taillamp  and the taillamp pocket in order to access the cavity  where 
the  threaded   plate is located.
- Remove the check link screws from the bracket (2).
 
- Remove the check link bracket (1) and the check link lock spring.
 
- Remove the check link bolts from the door.
 
- Remove the check link boot from the door (6).
 
- Remove the check link (5) from the inside of the door.
 
Installation Procedure
- Install the check link (5) to the door.
 
- Install the check link boot to the door (6).
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the check  link boot bolts to the door.
 
Tighten
Tighten the check link bolts to the door to 6 N·m (53 lb in).
- Install the check link
 bracket (1) and the check link lock spring.
 
- Install the check link bracket screws (2).
 
Tighten
Tighten the check link bracket screws to 4 N·m (35 lb in).
- Install the water deflector.
 
- Install the trim panel. Refer to 
Door Trim Panel Replacement 
.
 
                            Rear Door Check Link Replacement E54
                    
Removal Procedure
- Open the door.
 
- Remove the door trim panel. Refer to 
Rear Door Trim Panel Replacement 
.
 
- Remove the water deflector. Refer to 
Water Deflector Replacement 
.
 
- Remove the check link
 from the check link mounting bracket by lifting upward to release.
 
Important: Remove the one screw that retains the check link lock spring, if replacing
 just the check link lock spring. When replacing the check link bracket all
 three  screws will need to be removed. Remove one screw at a time when replacing
  the check link bracket. If all three screws are removed at once this may
 cause  the loss of the threaded anchor plate. If this occurs,  remove the
  taillamp  and the taillamp pocket in order to access the cavity  where 
the  threaded   plate is located.
- Remove the check link screws from the bracket (2).
 
- Remove the check link bracket (1) and the check link lock spring.
 
- Remove the check link bolts from the door.
 
- Remove the check link boot from the door (6).
 
- Remove the check link (5) from the inside of the door.
 
Installation Procedure
- Install the check link (5) to the door.
 
- Install the check link boot to the door (6).
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the check  link boot bolts to the door.
 
Tighten
Tighten the check link bolts to the door to 6 N·m (53 lb in).
- Install the  check link
bracket (1) and the check link lock spring.
 
- Install the check link bracket screws (2).
 
Tighten
Tighten the check link bracket screws to 4 N·m (35 lb in).
- Remove the water deflector. Refer to 
Water Deflector Replacement 
.
 
- Install the trim panel. Refer to 
Door Trim Panel Replacement 
.