Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | 
 Does the test lamp light?  | --  | Go to Step 3  | Go to Step 2  | 
2  | Locate and Repair an open in the ORN (1840) wire between the Load Leveling Pump and the UBEC. Is the action complete?  | --  | System OK  | --  | 
3  | Connect a test lamp from terminal A, PNK (639) to ground. Does the test lamp light?  | --  | Go to Step 5  | Go to Step 4  | 
4  | Locate and Repair an open in the PNK (639) wire between the Load Leveling Pump and the BBEC. Is the action complete?  | --  | System OK  | --  | 
5  | Connect a self-powered test lamp from terminal G, BLK (1350) to ground. Does the test lamp light?  | --  | Go to Step 7  | Go to Step 6  | 
6  | Locate and Repair an open in the BLK (1350) wire between Load Leveling Pump and ground. Is the action complete?  | --  | System OK  | --  | 
7  | 
 Does the test lamp light?  | --  | Go to Step 9  | Go to Step 8  | 
8  | Locate and Repair an open in the PNK (639) wire between the Load level Height Sensor and Splice S473. Is the action complete?  | --  | System OK  | --  | 
9  | Connect a self-powered test lamp from terminal A, BLK (1350) to ground. Does the test lamp light?  | --  | Go to Step 11  | Go to Step 10  | 
10  | Locate and Repair an open in the BLK (1350) wire between the Load level Height Sensor and Splice S471. Is the action complete?  | --  | System OK  | --  | 
11  | Connect a test lamp from terminal C, LT BLU (1298) to ground. Does the test lamp light?  | --  | Go to Step 12  | Go to Step 15  | 
12  | Connect a fused jumper wire from terminal B, YEL (321) to ground. Does the pump start and run?  | --  | Go to Step 13  | Go to Step 14  | 
13  | Replace the Load level Height Sensor. Is the action complete?  | --  | System OK  | --  | 
14  | Replace the Load Leveling Pump. Is the action complete?  | --  | System OK  | --  | 
15  | 
 Does the test lamp light?  | --  | Go to Step 16  | Go to Step 17  | 
16  | Locate and Repair the open in the LT BLU (1298) wire between the Load Leveling Timer Relay and the Load level Height Sensor. Is the action complete?  | --  | System OK  | --  | 
17  | Connect a test lamp (back probe) from terminal D, ORN (1840) at the Load Leveling Timer Relay to ground. Does the test lamp light?  | --  | Go to Step 19  | Go to Step 18  | 
18  | Locate and repair the open in the ORN (1840) wire between Load Leveling Timer Relay and UBEC Is the action complete?  | --  | System OK  | --  | 
19  | Replace the Load Leveling Timer Relay. Is the action complete?  | --  | System OK  | --  |