Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Instrument Cluster System Check?  | --  | Go to Step 2  | |
2  | 
 Is continuity present?  | --  | Go to Step 4  | Go to Step 3  | 
3  | Locate and repair the open in CKT 150 (BLK) between the TR Switch and G105. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
4  | 
 Is battery voltage present?  | --  | Go to Step 6  | Go to Step 5  | 
5  | Locate and repair the open in CKT 1020 (PNK) between the IP Fuse Block and the I/P Cluster. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
6  | Connect a J 39200 DMM (continuity) between pin 4 of the I/P Cluster connector to ground. Is continuity present?  | --  | Go to Step 8  | Go to Step 7  | 
7  | Locate and repair the open in CKT 451 (BLK/WHT) between the I/P Cluster and ground. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
8  | Replace the I/P Cluster. Refer to Instrument Cluster Replacement . Is the repair complete?  | --  | --  | 
Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Instrument Cluster System Check?  | --  | Go to Step 2  | |
2  | 
 Do all ranges illuminate?  | --  | Go to Step 3  | Go to Step 4  | 
3  | Adjust the transmission range switch. Refer to Park/Neutral Back Up Switch Adjustment in Transmission/Transaxle. Replace the PNP Switch. Refer toPark/Neutral Back Up Switch Replacement in Transmission/Transaxle. Is the repair complete?  | --  | --  | |
4  | 
 Is continuity present in the circuit(s) tested?  | --  | Go to Step 6  | Go to Step 5  | 
5  | Locate and repair the open in the circuit(s) that are faulty between the TR Switch and the I/P Cluster. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
6  | Connect a J 39200 DMM (continuity) between the I/P Cluster connector and ground to those circuit(s) that connected to the faulty PRNDL indicators. Is continuity present in the circuit(s) tested?  | --  | Go to Step 7  | Go to Step 8  | 
7  | Locate and repair the short to ground in the circuit(s) that are faulty between the TR Switch and the I/P Cluster. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
8  | Replace the I/P Cluster. Refer to Instrument Cluster Replacement . Is the repair complete?  | --  | --  |