Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Data Link Communications System Check?  | --  | Go to Step 2  | |
2  | 
 Can coomunications be established?  | --  | Go to Step 3  | Go to scan tools owners manual.  | 
3  | 
 Does the testlamp light?  | --  | Go to Step 4  | Go to Step 6  | 
4  | Connect the testlamp between terminals 16 and 4, and then 16 and 5 of the DLC. Does the testlamp light?  | --  | Go to Step 5  | Go to Step 7  | 
5  | Inspect the power and ground circuits of the DLC for intermittents and poor connections. Refer to Intermittents and Poor Connections Diagnosis Is the repair complete?  | --  | --  | |
6  | Locate and repair the open in CKT 840 (ORN) between the AUX PWR fuse and the DLC. Refer to Wiring Repairs Is the repair complete?  | --  | --  | |
7  | Locate and repair the open in CKT 150 (BLK) or CKT 451 (BLK/WHT) between the DLC and ground. Refer to Wiring Repairs Is the repair complete?  | --  | --  |