Important: 
|    •  | The intake manifold, throttle body, fuel injection rail and fuel  injectors
 may be removed as an assembly. If not servicing the individual components,
         install the intake manifold as a complete assembly. | 
 
|    •  | DO NOT use the old intake manifold gaskets again. Install NEW intake
 manifold-to-cylinder  head gaskets. | 
 
- Install NEW intake manifold-to-cylinder head gaskets (1).
 
- Install the intake manifold.
 
- Apply a 5 mm (0.20 in) band of threadlock GM P/N 12345382
 (Canadian P/N 10953489) or equivalent  to the threads of the
 intake manifold bolts.  Refer       to 
Sealers, Adhesives, and Lubricants 
.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the intake  manifold bolts.
 
Tighten
- Tighten intake manifold bolts first pass in sequence to 5 N·m
  (44 lb in).
 
- Tighten intake manifold bolts final pass in sequence to 10 N·m
  (89 lb in).
 
- Install the manifold absolute
 pressure  (MAP) sensor (1), if previously removed.
 
The
electrical  connector end of the sensor should be facing the front  of the
engine.
- Install the positive crankcase
 ventilation  (PCV) valve (2) and hose (1).
 
- Install the engine coolant air bleed hose and clamp onto the throttle
  body.
 
- Install the evaporative
 emission (EVAP)  purge solenoid (3), bolt (2), and isolator (1).
 
Tighten
Tighten the solenoid bolt to 10 N·m (89 lb in).