Callout  | Component Name  | ||||||
|---|---|---|---|---|---|---|---|
| 
 Notice: Refer to Fastener Notice in the Preface section. Fastener Tightening Specifications: Refer to Fastener Tightening Specifications. Preliminary Procedures
 
 
  | |||||||
1  | Exhaust Gas Recirculation (EGR) Coolant Pipe to Thermostat Housing Bolt Tighten  | ||||||
2  | EGR Coolant Pipe Bolt Tighten  | ||||||
3  | EGR Coolant Pipe Tip 
 
  | ||||||
Callout  | Component Name  | 
|---|---|
Preliminary Procedures
  | |
1  | EGR Coolant Pipe Clamp ProcedureUsing the J 38185 , compress the clamps. Special ToolsJ 38185 Hose Clamp Pliers  | 
2  | EGR Coolant Pipe ProcedureDisconnect the exhaust gas recirculation (EGR) coolant pipe from the EGR cooler tube.  |