- If removed install the thermostat.
 
Notice: Refer to Fastener Notice in the Preface section.
- If removed install the water outlet.
 
Install the water outlet bolts. Refer to 
Water Outlet Installation
 .
- If removed install the engine coolant temperature (ECT) sensor.
 
Tighten
Tighten the engine coolant temperature (ECT) sensor to 23 N·m (17 lb ft).
Important: All gasket-mating surfaces need to be free of oil, and foreign material. Use GM P/N 12346139 (Canadian P/N 10953463) or equivalent to clean surfaces.
- Install the lower intake manifold gaskets.
 
- With gaskets in place supply a small drop 8-10 mm (0.31 -0.39 in) of RTV Sealer GM P/N 12346141 (Canadian P/N 89022195) or equivalent to the 4 corners of the intake manifold to
block joint (1).
 
- Connect the 2 small drops with a bead of RTV Sealer that is between 8-10 mm (0.30-0.39 in) wide and 3.0-5.0 mm (0.12-0.20 in) thick (2).
 
- Install the valve rocker arms and pushrods. Refer to 
Valve Rocker Arm and Push Rod Replacement
 .
 
Notice: Refer to Fastener Notice in the Preface section.
Important: All lower intake manifold bolts need to be cleaned and free of any foreign material, only new bolts are to be used.
Important: Manufacturer recommends the center bolts be fully torqued before the diagonal bolts to assure proper seal ability.
Important: Lower intake manifold bolts in location 6 and 7 should be torqued to specification using a crows foot type tool.
- Install the lower intake manifold.
 
Install NEW lower intake manifold bolts.
Tighten
- Tighten the lower intake manifold bolts in sequence to 7 N·m (62 lb in) on the first pass.
 
- Tighten the lower intake manifold bolts (1,2,3,4) in sequence to 13 N·m (115 lb in) on the final pass.
 
- Tighten the lower intake manifold bolts (5,6,7,8) in sequence to 25 N·m (18 lb ft) on the final pass.
 
- Connect the thermostat bypass hose to the thermostat bypass pipe and lower intake manifold pipe.
 
- Connect the radiator inlet hose to the engine. Refer to 
Radiator Inlet Hose Replacement
 in Engine Cooling.
 
- Install the heater inlet pipe.
 
- Install the heater inlet pipe nut.
 
Tighten
Tighten the heater inlet pipe nut to 25 N·m (18 lb ft).
- Install the power steering pump to the front engine cover. Refer to 
Power Steering Pump Replacement
 in Power Steering System.
 
Important: Do not press on the fuel pressure regulator valve when installing the fuel injector rail assembly.
- Install the fuel injector rail assembly.
 
| 14.1.  | Install the fuel injector O-rings using GM P/N 12345616 (Canadian P/N 993182). | 
 
| 14.2.  | Install the injector nozzles into the lower intake manifold injector bores. | 
 
| 14.3.  | Press on the injector rail using the palms of both hands until the injectors are fully seated. | 
 
- Install the fuel injector rail bolts.
 
Tighten
Tighten the fuel injector rail bolts to 10 N·m (89 lb in).
- Connect the fuel return pipe to the fuel injector rail. Refer to 
Fuel Injection Fuel Rail Assembly Replacement
 in Engine Controls - 3.4L.
 
- Connect the fuel feed pipe to the fuel injector rail. Refer to 
Fuel Injection Fuel Rail Assembly Replacement
 in Engine Controls - 3.4L.
 
- Install the fuel feed and return pipe retaining clip.
 
- Install the fuel feed and return pipe retaining clip bolt.
 
Tighten
Tighten the fuel feed and return pipe retaining clip bolt to 8 N·m (71 lb in).
- Connect the fuel injector and manifold air pressure (MAP) wiring harness.
 
- Connect the engine coolant temperature
(ECT) wiring harness.
 
- Install the right valve rocker arm cover. Refer to 
Valve Rocker Arm Cover Replacement
 .
 
- Install the left valve rocker arm cover. Refer to 
Valve Rocker Arm Cover Replacement
 .
 
- Install the upper intake manifold. Refer to 
Intake Manifold Replacement
 .
 
- Connect the battery ground (negative) cable. Refer to 
Battery Negative Cable Disconnection and Connection
 in Engine Electrical.