Positive Crankcase Ventilation Hose/Pipe/Tube Replacement Left - LBZ, LLY
                    
Removal Procedure
Important: After removing the charged air cooler duct, cover the turbocharger opening with tape in order to prevent entry of objects.
- Remove the air cleaner. Refer to 
Air Cleaner Replacement
 .
 
- Loosen the charged air cooler inlet duct connector to turbocharger clamp (1).
 
Important: Do not use a screwdriver or other tool to pry the hose loose. The hose can be torn or damaged. Loosen the hose by twisting.
- Remove the charged air cooler inlet duct connector (4) from the turbocharger.
 
- Reposition the positive crankcase ventilation (PCV) hose clamp at the resonator tee.
 
- Remove the PCV hose from the tee.
 
- Remove the left PCV hose/pipe bolt.
 
- Remove the left PCV hose/pipe assembly.
 
Installation Procedure
- Install the left PCV hose/pipe assembly.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the left PCV hose/pipe bolt.
 
Tighten
Tighten the bolt to 18 N·m (13 lb ft).
- Install the PCV hose to the tee.
 
- Position the PCV hose clamp at the resonator tee.
 
- Remove the tape from the turbocharger openings.
 
Important: Lubricate the end of the duct prior to installation.
- Install the charged air cooler inlet duct connector (4) to the turbocharger.
 
- Tighten the charged air cooler inlet duct connector to turbocharger clamp (1).
 
Tighten
Tighten the clamp to 6 N·m (53 lb in).
- Install the air cleaner. Refer to 
Air Cleaner Replacement
.
 
                            Positive Crankcase Ventilation Hose/Pipe/Tube Replacement Right - LBZ, LLY
                    
Removal Procedure
Important: After removing the air cleaner outlet duct, cover the turbocharger opening with tape in order to prevent entry of objects.
- Remove the air cleaner. Refer to 
Air Cleaner Replacement
.
 
- Loosen the charged air cooler outlet duct to intake hose clamp.
 
Important: Do not use a screwdriver or other tool to pry the hose loose. The hose can be torn or damaged. Loosen the hose by twisting.
- Remove the charged air cooler outlet duct from the intake.
 
- Reposition the positive crankcase ventilation (PCV) hose clamp at the resonator tee.
 
- Remove the PCV hose from the tee.
 
- Remove the right PCV hose/pipe bolt.
 
- Remove the right PCV hose/pipe assembly.
 
Installation Procedure
- Install the right PCV hose/pipe assembly.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the right PCV hose/pipe bolt.
 
Tighten
Tighten the bolt to 18 N·m (13 lb ft).
- Install the PCV hose to the tee.
 
- Position the PCV hose clamp at the resonator tee.
 
- Remove the tape from all turbocharger openings.
 
Important: Lubricate the end of the duct prior to installation.
- Install the charged air cooler outlet duct to the intake.
 
- Tighten the charged air cooler outlet duct to intake hose clamp.
 
Tighten
Tighten the clamp to 6 N·m (53 lb in).
- Install the air cleaner. Refer to 
Air Cleaner Replacement
.