Thermostat Bypass Pipes Replacement 6.6L LLY
                    
Removal Procedure
- Remove the drive belt. Refer to 
Drive Belt Replacement
 for the 6.6L
(LLY) engine.
 
- Remove the bypass pipe from the thermostat housing
 
- Remove and discard the O-ring seals from the bypass pipe and the water pump.
 
- Clean the sealing surfaces of the bypass pipe.
 
- If required, clean and inspect the bypass pipe and thermostat housing. Refer to 
Engine Coolant Thermostat Housing Cleaning and Inspection
 for the 6.6L (LLY) engine.
 
Installation Procedure
- Install a NEW O-ring seal onto the bypass pipe.
 
- Install a NEW O-ring seal to the water pump.
 
- Lubricate the O-ring seals with clean engine coolant.
 
- Install the bypass pipe into the thermostat housing.
 
- Install the drive belt. Refer to 
Drive Belt Replacement
 for the 6.6L (LLY) engine.