Removal Procedure
Important: The striker plate is mounted in a cage that allows some degree of adjustment
independent of the outer panels position. Use body dimensions to ensure that
      the striker mounting location falls within the plates range of adjustment.
- Remove all related panels and components.
 
- Visually inspect and restore as much of the damage as possible.
 
- Remove sealers and anti-corrosion materials as necessary.
 
Important: When sectioning both the inner (3) and the outer panels (2) this should
result in a 100 mm (4 in) offset in the sectioning joints. Use
      care not to cut the inner door opening frame when cutting the center
 pillar      reinforcement.
Important: Sectioning of the center pillar reinforcement should be performed only
in the specified sectioning locations.
- Cut the reinforcement (3) panel 250 mm (13 3/4 in)
from the lower edge of the door opening (1).
 
- Locate and mark all factory welds. Note the number and location
of welds for installation of the service assembly.
 
- Drill out all factory welds.
 
Installation Procedure
- On the service part (5)
mark a horizontal line to leave a gap of 1 ½ times the thickness
 of     the metal (6) at  the sectioning joint.
 
- Cut the service reinforcement panel along this line.
 
- Cut a 50 mm (2 in) piece from the unused portion
of the service part (5) for a backing plate.
 
- Remove the flange on each side of the backing plate (4) so that
it will fit behind the sectioning joint (6).
 
- Drill 8 mm (5/16 in) holes for plug welding in the
service part in the location noted from the original panel.
 
- Drill holes for plug welding along the sectioning cuts on both
the service part (5) and the original panel (3).
 
- Locate these holes approximately 13 mm (1/2 in)
from the edge of the sectioning cuts.
 
- Prepare the mating surfaces and position the backing plate with
25 mm (1 in) of the backing plate exposed. Position the service
   part (5) to overlap the exposed backing plate.
 
- Make 25 mm (1 in) welds along the seams with 25 mm
(1 in) gaps between. 
 
- Go back and complete the stitch weld. This will create solid joint
with minimal heat distortion. 
 
- Complete all other welds as necessary.
 
- Clean and prepare welded surfaces.
 
Important: Prior to refinishing, refer to GM 4901MD-99 Refinish Manual for
recommended products. Do not combine paint systems. Refer to paint manufacturer's
    recommendations.
- Prime with 2 part catalyzed primer.
 
- Apply sealers and anti-corrosion materials as necessary.