Removal Procedure
- Disconnect the negative battery cable. Refer to 
Battery Negative Cable Disconnection and Connection 
 in Engine  Electrical.
 
- Remove the left instrument panel (I/P) insulator. Refer to 
Instrument Panel Insulator Panel Replacement - Left Side 
 in Instrument Panel, Gages, and Console.
 
- Remove the screws from the accessory  wiring junction block.
 
- Adjust the junction block for access.
 
- Remove the circuit breakers (4) and the relays from the  junction block  as required. Refer to 
Relay Replacement 
.
 
- If necessary remove the junction block from the bracket assembly.
 
Installation Procedure
- If necessary install the junction block  to the bracket assembly.
 
- Install the circuit breakers (4) and the relays to the  junction block  as required.
 
- Position the junction block to the I/P carrier.
 
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the junction block screws.
 
Tighten
Tighten the screws to 10 N·m (89 lb in).
- Install the left I/P insulator. Refer to 
Instrument Panel Insulator Panel Replacement - Left Side 
 in Instrument Panel, Gages, and Console.
 
- Connect the negative battery cable. Refer to 
Battery Negative Cable Disconnection and Connection 
 in Engine   Electrical.