Removal Procedure
Caution: Refer to Battery Disconnect Caution in the Preface section.
- Disconnect the negative battery.
 
- Remove the instrument panel and tie-bar. Refer to 
Instrument Panel Assembly Replacement 
 in Instrument Panel, Gages
and Console.
 
- Drain the cooling system. Refer to 
Cooling System Draining and Filling 
 in Engine Cooling.
 
- Compress the heater hose clamps at the cowl and slide the clamps toward
the engine.
 
- Remove the 2 heater hoses from the core pipes and the cowl.
 
- Remove the screws that secure the heater/air distributor case assembly to the
cowl on the side of the heater core pipes.
 
- Remove the high-pressure and low-pressure pipe from the A/C expansion valve.
 
- Remove the evaporator drain hose.
 
- Have an assistant support the heater/air distributor case from inside
the vehicle.
 
- Remove the screws that secure the heater/air distributor case assembly
to the cowl on the side of the evaporator.
 
- Disconnect the rear duct connector.
 
Notice: Use care when handling the heater case to avoid damaging the mode linkage levers.
- Remove the heater/air distributor case assembly from the vehicle.
 
Installation Procedure
- Position the heat/air distributor case assembly in the vehicle.
 
Important: Avoid damaging the heater core pipes by making
sure they do not contact the cowl opening.
- Slowly raise the heater/air distributor case assembly into position against
the cowl and hold it in position while the screws are installed and tighten from the
engine side of the cowl.
 
- Install the high pressure and low pressure pipe.
 
Notice: Refer to Fastener Notice in the Preface section.
- Install the heater/air distributor case assembly screws at the side of evaporator
through the cowl from the engine compartment side.
 
Tighten
Tighten the heater/air distributor case assembly
screws to 4 N·m (35 lb in).
- Install the heater/air distributor case assembly screws at the side of the heater
core pipes through the cowl from the engine compartment side.
 
Tighten
Tighten the heater/air distributor case assembly
screws to 4 N·m (35 lb in).
- Install the 2 heater hoses.
 
- Slide the heater hose clamps into position.
 
- Connect the rear duct connector.
 
-  Install the instrument panel and tie-bar. Refer to 
Instrument Panel Assembly Replacement 
 in Instrument Panel, Gages
and Console.
 
- Fill the cooling system. Refer to 
Cooling System Draining and Filling 
 in Engine Cooling.
 
- Connect the negative battery cable.
 
- Operate the controls to verify the proper function of the heating and
ventilation systems.