Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the ALC Suspension System Check?  | --  | Go to Step 2  | |
2  | 
 Does the load leveling pump stop running?  | --  | Go to Step 3  | Go to Step 8  | 
3  | Test CKT 1250 (BLK) at terminal F, of the load leveling timer relay for a short to ground. Is a short to ground present in CKT 1250 (BLK)?  | --  | Go to Step 4  | Go to Step 7  | 
4  | 
 Is a short to ground present in CKT 1250 (BLK)?  | --  | Go to Step 5  | Go to Step 6  | 
5  | Repair the short to ground in CKT 1250 (BLK). Is the repair complete?  | --  | --  | |
6  | Replace the load leveling air inflator switch. Refer to Automatic Level Control Inflator Air Switch Replacement . Is the replacement complete?  | --  | --  | |
7  | Replace the load leveling timer relay. Refer to Automatic Level Control Relay Replacement . Is the replacement complete?  | --  | --  | |
8  | Disconnect the load leveling height sensor. Does the load leveling pump stop running?  | --  | Go to Step 9  | Go to Step 10  | 
9  | Replace the load leveling height sensor. Refer to Automatic Level Control Sensor and Bracket Replacement . Is the replacement complete?  | --  | --  | |
10  | 
 Is a short to ground present in CKT 321 (YEL)  | --  | Go to Step 11  | Go to Step 12  | 
11  | Repair the short to ground in CKT 321 (YEL). Is the repair complete?  | --  | --  | |
12  | 
 Does the load leveling pump run?  | --  | Go to Step 13  | Go to Step 14  | 
13  | Repair the short to voltage on the BLK/LT GRN wire. Is the repair complete?  | --  | --  | |
14  | Replace the relay in the load leveling pump. Refer to Air Compressor Relay Replacement . Is the replacement complete?  | --  | --  |