Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you review the charging system operation and perform the necessary inspections?  | --  | ||
2  | Verify that the charge indicator is inoperative. Does the charge indicator operate normally?  | --  | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems  | |
3  | Using the scan tool, inspect for DTCs. Are any DTCs present?  | --  | Go to the Appropriate DTC  | |
4  | 
 Do all of the indicators turn ON and OFF properly?  | --  | Go to Diagnostic System Check - Instrument Cluster in Instrument Panel, Gauges and Console  | |
5  | Test for voltage at pin B of the generator. Is the voltage within the specified range?  | 9-16 V  | ||
6  | Replace the generator Refer to Generator Replacement . Is the repair complete?  | --  | --  | |
7  | Locate and repair the open in CKT 225 (RED) between the generator and the PCM/VCM Refer to Circuit Testing and Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
8  | Operate the system in order to verify the repair. Did you correct the condition?  | --  | System OK  |