Step  | Action  | Value(s)  | Yes  | No  | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1  | Did you review the HVAC system operation and perform the necessary inspections?  | --  | Go to Step 2  | Go to Symptoms  | ||||||||||
2  | Verify that the blower motor is inoperative at any speed. Does the blower motor operate normally?  | --  | Go to Testing for Intermittent Conditions and Poor Connections in Wiring Systems  | Go to Step 3  | ||||||||||
3  | Inspect the HVAC fuse 9. Is the HVAC fuse 9 open?  | --  | Go to Step 4  | Go to Step 5  | ||||||||||
4  | 
 
 
 
 
 
 Is the repair complete?  | --  | Go to Step 18  | --  | ||||||||||
5  | 
 
 
 
 Does the J 39200 DMM display battery voltage?  | --  | Go to Step 6  | Go to Step 13  | ||||||||||
6  | Connect a fused jumper wire between the blower motor relay cavity 87A and cavity 30. Does the blower motor operate?  | --  | Go to Step 7  | Go to Step 8  | ||||||||||
7  | Replace the blower motor relay. Is the replacement complete?  | --  | Go to Step 18  | --  | ||||||||||
8  | 
 Does the J 39200 display battery voltage?  | --  | Go to Step 10  | Go to Step 9  | ||||||||||
9  | Repair the open in CKT 65 (PPL) between the blower motor and the blower motor relay. Is the repair complete?  | --  | Go to Step 18  | --  | ||||||||||
10  | 
 Does the J 39200 DMM display battery voltage?  | --  | Go to Step 11  | Go to Step 12  | ||||||||||
11  | Replace the blower motor. Refer to Blower Motor and Fan Replacement . Is the replacement complete?  | --  | Go to Step 18  | --  | ||||||||||
12  | Repair the open in CKT 850 (BLK) between the blower motor and G117. Is the repair complete?  | --  | Go to Step 18  | --  | ||||||||||
13  | 
 Does the J 39200 DMM display battery voltage?  | --  | Go to Step 15  | Go to Step 14  | ||||||||||
14  | Repair the open in CKT 141 (BLK) between the heater and A/C controller and the IP fuse block. Is the repair complete?  | --  | Go to Step 18  | --  | ||||||||||
15  | 
 Does the J 39200 DMM display battery voltage?  | --  | Go to Step 16  | Go to Step 17  | ||||||||||
16  | Repair the open in CKT 64 (BRN) between the heater and A/C controller cavity E connector C4 and cavity B connector C2. Is the repair complete?  | --  | Go to Step 18  | --  | ||||||||||
17  | Replace the heater and A/C controller. Refer to Control Assembly Replacement . Is the replacement complete?  | --  | Go to Step 18  | --  | ||||||||||
18  | Operate the system in order to verify the repair. Did you correct the condition?  | --  | System OK  | Go to Step 3  |