| • | J 8001 Dial Indicator Set | 
| • | J 8087 Cylinder Bore Gage | 
| • | J 45059 Angle Meter | 
| • | Wear | 
| • | Taper | 
| • | Runout | 
| • | Ridging | 
| 13.1. | Temporarily install the crankshaft. Measure the crankshaft flange runout. | 
| 13.2. | Hold a gauge plate flat against the crankshaft flange. | 
| 13.3. | Place J 8001 indicator set (dial indicator stem) on the transmission mounting bolt hole boss. Set the indicator to zero. | 
| 13.4. | Record the readings obtained from all of the bolt hole bosses. The measurements should not vary more than 0.25 mm (0.010 in). | 
| 13.5. | Recheck the crankshaft flange runout if the readings vary more than 0.25 mm (0.010 in). If the crankshaft flange runout is within the specification, replace the engine block. | 
Caution: Refer to Fastener Caution in the Preface section.
| 15.1. | Tighten the crankshaft bearing cap bolts to 25 N·m (18 lb ft). | 
| 15.2. | Use J 45059 meter to tighten the crankshaft bearing cap bolts an additional 180 degrees. | 
Note: Perform the following inspections, and reconditioning (if necessary), with the crankshaft main bearing caps installed and tightened to specification.