Step  | Action  | Value(s)  | Yes  | No  | ||||
|---|---|---|---|---|---|---|---|---|
1  | Inspect the ignition (IGN) 1 fuse. Is the ignition (IGN) 1 fuse open?  | --  | Go to Step 2  | Go to Step 3  | ||||
2  | Repair the short to ground in CKT 39. Is the repair complete?  | --  | Go to Charging System Check  | --  | ||||
3  | 
 Is the voltage equal to the specified value?  | 5V  | Go to Step 4  | Go to Step 9  | ||||
4  | Measure the voltage from the generator battery (Bat) terminal to ground. Is the voltage equal to the specified value?  | 9-14V  | Go to Step 5  | Go to Step 12  | ||||
5  | 
 Is the voltage equal to the specified value?  | 13-16V  | Go to Step 6  | Go to Step 8  | ||||
6  | Load test the generator. Generator Assembly Check Did the generator test OK?  | --  | Go to Step 7  | Go to Step 8  | ||||
7  | Replace the battery. Refer to Battery Replacement. Is the repair complete?  | --  | Go to Charging System Check  | --  | ||||
8  | 
 Is the repair complete?  | --  | Go to Charging System Check 
  | --  | ||||
9  | Inspect for a poor connection or an open in CKT 225. Is there a poor connection or an open in CKT 225?  | --  | Go to Step 10  | Go to Step 11  | ||||
10  | Repair the poor connection or the open in CKT 225. Is the repair complete?  | --  | Go to Charging System Check  | --  | ||||
11  | Replace the powertrain control module (PCM). Powertrain Control Module Replacement/Programming Is the repair complete?  | --  | Go to Charging System Check  | --  | ||||
12  | Repair one of the following conditions: 
 
 Is the repair complete?  | --  | Go to Charging System Check  | --  |