Generator Replacement With 4.2L Engine
                    
Removal Procedure
- Disconnect the battery negative cable. Refer to 
Battery Negative Cable Disconnection and Connection
 .
 
- Remove the drive belt. Refer to 
Drive Belt Replacement
 .
 
- Remove the air conditioning (A/C) line mounting bracket bolt at the engine lift hook.
 
- Remove the right engine lift hook bolts and remove the lift hook.
 
- Remove the 3 generator mounting bolts and remove the generator.
 
- Disconnect the battery positive cable nut (1) on the generator.
 
Installation Procedure
Notice: Refer to Fastener Notice in the Preface section.
- Install the battery positive cable to the generator and secure the positive cable with the nut (1).
 
Tighten
Tighten the generator positive cable nut to 9 N·m (80 lb in).
- Install the generator and secure the generator with 3 bolts.
 
Tighten
Tighten the generator bolts to 50 N·m (37 lb ft).
- Install the engine lift hook and secure the lift hook with 2 bolts.
 
Tighten
Tighten the bolts to 50 N·m (37 lb ft).
- Install the A/C line bracket to the lift hook and secure the bracket with the bolt.
 
Tighten
Tighten the A/C line bracket bolt to 10 N·m (89 lb in).
- Install the drive belt. Refer to 
Drive Belt Replacement
 .
 
- Connect the battery negative cable. Refer to 
Battery Negative Cable Disconnection and Connection
 .