Intake Manifold Assemble L35
                    
- If reusing the fastener,
  apply threadlock GM P/N 12345382 (Canadian P/N 10953489)
   or equivalent, to the threads      of the fuel meter  body bracket bolt.
 
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the fuel  meter body bracket and bolt.
 
Tighten
Tighten the fuel meter bracket bolt to 10 N·m (89 lb in).
- Install the fuel meter body into the fuel meter body bracket.
 
- Install the 6 poppet nozzles into the proper lower intake manifold
  bores.
 
- Inspect the poppet nozzles in order to ensure that the poppet
  nozzles are firmly seated and locked in the lower intake manifold bores.
 
- Install a NEW fuel meter body seal into the groove of the fuel
  meter body.
 
- Install a NEW upper intake
  manifold to lower intake manifold gasket into the groove of the upper intake
        manifold.
 
- Install the upper intake manifold onto the lower intake manifold.
 
- If reusing the fasteners, apply threadlock GM P/N 12345382
(Canadian P/N 10953489) or equivalent,    to the threads of
the upper intake manifold attaching studs.
 
- Install the upper intake manifold attaching studs.
 
Tighten
- Tighten the upper intake manifold attaching studs on the first
  pass to 5 N·m (44 lb in).
 
- Tighten the upper intake manifold attaching studs on the final
  pass to 9 N·m (80 lb in).
 
- If reusing the fasteners,
  apply threadlock GM P/N 12345382 (Canadian P/N 10953489)
   or equivalent, to the threads      of the evaporative  emission (EVAP)
canister    purge solenoid valve studs.
 
- Install the EVAP canister purge solenoid valve and studs.
 
Tighten
Tighten the EVAP canister purge solenoid valve studs to 10 N·m
  (89 lb in).
- Install the engine wiring harness bracket and nut.
 
Tighten
Tighten the engine wiring harness bracket nut to 12 N·m
  (106 lb in).
- Install the NEW fuel seals (8),
  black O-rings, into the fuel meter body.
 
- Install the NEW spacer rings (7), flat washers, into the
  fuel meter body.
 
- Install the NEW fuel seals (6), yellow O-rings, into the
  fuel meter body.
 
- Install the NEW fuel seal retainers (5) into the fuel meter
  body.
 
- Install the fuel pipe (3) into the fuel meter body.
 
- Install the fuel pipe retainer bracket (2) onto the fuel
  pipe.
 
- Install the fuel pipe retainer bracket nuts (1).
 
- If reusing the fastener, apply threadlock GM P/N 12345382
(Canadian P/N 10953489) or equivalent,    to the threads of
the fuel pipe bolt.
 
- Install the fuel pipe bolt (4).
 
Tighten
- Tighten the fuel pipe bracket nuts to 3 N·m (27 lb in).
 
- Tighten the fuel pipe bolt to 6 N·m (53 lb in).
 
- Install a NEW manifold
  absolute pressure (MAP) sensor seal onto the MAP sensor.
 
- Apply a small amount, approximately 1 drop, of clean engine
  oil to the MAP sensor seal.
 
- Install the MAP sensor into the upper intake manifold.
 
- Install the ignition coil
  and studs.
 
Tighten
Tighten the ignition coil studs to 12 N·m (106 lb in).
- If reusing the engine
  coolant temperature (ECT) sensor plug (1) or the ECT sensor (2),
   if equipped,     apply sealant GM P/N 12346004 (Canadian P/N 10953480)
or equivalent, to the threads        of the ECT sensor plug (1) or
the ECT sensor (2).
 
- Install the ECT sensor or plug, if equipped, into the front of
  the lower intake manifold.
 
Tighten
Tighten the ECT sensor or plug to 20 N·m (15 lb ft).
Important: The exhaust gas recirculation (EGR) valve must be installed in the original
  orientation. Some applications will not have an EGR valve.
- Install a NEW EGR valve gasket and the EGR valve.
 
- Install the EGR valve
  bolts.
 
Tighten
- Tighten the EGR valve bolts on the first pass to 7 N·m
  (62 lb in).
 
- Tighten the EGR valve bolts on the final pass to 30 N·m
  (22 lb ft).
 
- Install the engine coolant
  thermostat.
 
- Install the water outlet (1 or 2).
 
- Install the water outlet studs.
 
Tighten
Tighten the water outlet studs to 25 N·m (18 lb ft).
- Install a NEW throttle
  body gasket into the groove in the upper intake manifold.
 
- Install the throttle body onto the upper intake manifold.
 
- If reusing the fasteners,
  apply threadlock GM P/N 12345382 (Canadian P/N 10953489)
   or equivalent, to the threads      of the throttle  body attaching studs.
 
- Install the throttle body attaching studs.
 
Tighten
Tighten the throttle body attaching studs to 9 N·m (80 lb in).
- Install the accelerator
  control cable  bracket, the studs, and the nuts.
 
Tighten
- Tighten the accelerator control cable bracket stud to the intake
  manifold to 6 N·m (53 lb in).
 
- Tighten the accelerator control cable bracket nuts to 12 N·m
  (106 lb in).
 
- Tighten the accelerator control cable bracket stud to the throttle
  body to 12 N·m (106 lb in).
 
                            Intake Manifold Assemble LU3
                    
Important: During the removal of the fuel injector assembly,
the retainers that hold the injectors into the intake manifold may become worn. This
is OK. Upon installation of the upper intake manifold the injectors will remain fully
seated, thus keeping them from backing out of the lower intake manifold.
- If reusing the fastener, apply threadlock GM P/N 12345382 (Canadian P/N 10953489)
 or equivalent, to the threads of the fuel meter body bracket bolt.
 
Notice: Use the correct fastener in the correct location. Replacement fasteners
must be the correct part number for that application. Fasteners requiring
replacement or fasteners requiring the use of thread locking compound or sealant
are identified in the service procedure. Do not use paints, lubricants, or
corrosion inhibitors on fasteners or fastener joint surfaces unless specified.
These coatings affect fastener torque and joint clamping force and may damage
the fastener. Use the correct tightening sequence and specifications when
installing fasteners in order to avoid damage to parts and systems.
- Install the fuel meter body bracket and bolt.
 
Tighten
Tighten the fuel meter bracket bolt to 10 N·m
(89 lb in).
Important: All injector lines must face forward as the
fuel meter body is snapped into the bracket. Also, the number three fuel tube must
be positioned behind the number one fuel tube to eliminate interference with the
upper intake manifold when installed.
- Install the fuel meter body into the fuel meter body bracket.
 
- Install the 6 injectors into the proper lower intake manifold 
 bores in proper sequence (3, 5, 1, 2, 4, 6).
 
- Inspect the injectors in order to ensure that they are firmly seated
and locked in the lower intake manifold bores.
 
- Ensure that the electrical connections of the injectors are positioned
 so that they do not interfere with each other, and are pointing towards the center
of the intake manifold. Rotate the electrical connector inboard if necessary. Also,
ensure there is no tension on the injector wires.
 
- Install a NEW upper intake manifold to
lower intake manifold gasket into the groove of the upper intake manifold.
 
- Install the upper intake manifold onto the lower intake manifold.
 
- If reusing the fasteners, apply threadlock GM P/N 12345382
 (Canadian P/N 10953489) or equivalent, to the threads of the upper
intake manifold attaching studs.
 
- Install the upper intake manifold attaching studs.
 
Tighten
- Tighten the upper intake manifold attaching studs on the first pass
to 5 N·m (44 lb in).
 
- Tighten the upper intake manifold attaching studs on the final pass
to 9 N·m (80 lb in).
 
- If reusing the fasteners, apply threadlock
GM P/N 12345382 (Canadian P/N 10953489) or equivalent,
to the threads of the evaporative emission (EVAP) canister purge solenoid valve
studs.
 
- Install the EVAP canister purge solenoid valve and studs.
 
Tighten
Tighten the EVAP canister purge solenoid valve studs
to 10 N·m (89 lb in).
- Install the engine wiring harness bracket and nut.
 
Tighten
Tighten the engine wiring harness bracket nut to
12 N·m (106 lb in).
- Install the NEW fuel seals (8), 
 black O-rings, into the fuel meter body.
 
- Install the NEW spacer rings (7), flat washers, into the fuel
meter body.
 
- Install the NEW fuel seals (6), yellow O-rings, into the fuel
meter body.
 
- Install the NEW fuel seal retainers (5) into the fuel meter body.
 
- Install the fuel pipe (3) into the fuel meter body.
 
- Install the fuel pipe retainer bracket (2) onto the fuel pipe.
 
- Install the fuel pipe retainer bracket nuts (1).
 
- If reusing the fastener, apply threadlock GM P/N 12345382
 (Canadian P/N 10953489) or equivalent, to the threads of the fuel
pipe bolt.
 
- Install the fuel pipe bolt (4).
 
Tighten
- Tighten the fuel pipe bracket nuts to 3 N·m (27 lb in).
 
- Tighten the fuel pipe bolt to 6 N·m (53 lb in).
 
- Install a NEW manifold absolute pressure
(MAP) sensor seal onto the MAP sensor.
 
- Apply a small amount, approximately 1 drop, of clean engine oil
to the MAP sensor seal.
 
- Install the MAP sensor into the upper intake manifold.
 
- Install the ignition coil and studs.
 
Tighten
Tighten the ignition coil studs to 12 N·m
(106 lb in).
- If reusing the engine coolant temperature
(ECT) sensor plug (1) or the ECT sensor (2), if equipped, apply sealant
GM P/N 12346004 (Canadian P/N 10953480) or equivalent,
to the threads of the ECT sensor plug (1) or the ECT sensor (2).
 
- Install the ECT sensor or plug, if equipped, into the front of the lower
intake manifold.
 
Tighten
Tighten the ECT sensor or plug to 20 N·m
(15 lb ft).
Important: The exhaust gas recirculation (EGR) valve
must be installed in the original orientation. Some applications will not have an
EGR valve.
- Install a NEW EGR valve gasket and the EGR valve.
 
- Install the EGR valve bolts.
 
Tighten
- Tighten the EGR valve bolts on the first pass to 7 N·m 
(62 lb in).
 
- Tighten the EGR valve bolts on the final pass to 30 N·m 
 (22 lb ft).
 
- Install the engine coolant thermostat.
 
- Install the water outlet (1 or 2).
 
- Install the water outlet studs.
 
Tighten
Tighten the water outlet studs to 25 N·m
(18 lb ft).
- Install a NEW throttle body gasket into the groove in the upper intake manifold.
 
- Install the throttle body onto the upper intake manifold.
 
- If reusing the fasteners, apply threadlock GM P/N 12345382 (Canadian P/N 10953489)
 or equivalent, to the threads of the throttle body attaching studs.
 
- Install the throttle body attaching studs.
 
Tighten
Tighten the throttle body attaching studs to 9 N·m
(80 lb in).
- Install the accelerator control cable
bracket, the studs, and the nuts.
 
Tighten
- Tighten the accelerator control cable bracket stud to the intake manifold
to 6 N·m (53 lb in).
 
- Tighten the accelerator control cable bracket nuts to 12 N·m
 (106 lb in).
 
- Tighten the accelerator control cable bracket stud to the throttle body
to 12 N·m (106 lb in).