Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Memory Mirror System Check?  | --  | Go to Step 2  | |
2  | 
 Does the voltage measure within the specified range?  | 10-15 V  | Go to Step 3  | Go to Step 5  | 
3  | Measure the voltage between the memory seat/mirror module connector C1 terminal A and terminal B. Does the voltage measure within the specified range?  | 10-15 V  | Go to Step 4  | Go to Step 6  | 
4  | Replace the memory seat/mirror module. Is the repair complete?  | --  | --  | |
5  | Repair the open or short to ground in CKT 1340 (ORN). Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |
6  | Repair the open in CKT 1250 (BLK). Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  |