Removal Procedure
- Loosen and lower pinch clamp connecting the bank 1
intermediate pipe/hose to the crossover pipe/hose.
 
- Loosen and lower the pinch clamp connecting the bank 1 intermediate
pipe/hose to the secondary air injection (AIR) shut-off valve.
 
- Remove the nut securing the bank 1 intermediate pipe/hose to the
transaxle.
 
- Remove the nut securing the bank 1 intermediate pipe/hose to the
AIR shut-off valve bracket.
 
- Disconnect the exhaust gas recirculation (EGR) pipe.
 
- Carefully remove the bank 1 intermediate pipe/hose from the engine.
 
Installation Procedure
- Carefully install the bank 1 intermediate
pipe/hose.
 
Notice: Refer to Fastener Notice in the Preface section.
- Reconnect the EGR pipe.
 
Tighten
Tighten the EGR pipe to 60 N·m (44
lb ft).
- Install the nuts securing the bank 1 intermediate pipe/hose to
the AIR shut-off valve bracket and the transaxle.
 
Tighten
Tighten the nuts to 9 N·m (80 lb in).
- Install the hose and pinch clamp connecting the bank 1 intermediate
pipe/hose to the AIR shut-off valve.
 
- Install the hose and pinch clamp connecting the bank 1 intermediate
pipe/hose to the AIR crossover pipe/hose.