| • | Fusible link nut (1) |
| • | Fusible link bolt (2) |
Important: Route the positive battery cable the same way as originally installed.
Caution: Refer to Fastener Caution in the Preface section.
| • | Fusible link nut (1) and tighten to 10 N·m (89 lb in). |
| • | Fusible link bolt (2) and tighten to 10 N·m (89 lb in). |