Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Backup Lights System Check?  | --  | Go to Step 2  | Go to Backup Lamp System Check  | 
2  | 
 Is the voltage within the specified range?  | 10-15 V  | Go to Step 3  | Go to Step 5  | 
3  | Connect a fused jumper between the park/neutral position switch connector C1 cavity B (PNK) and cavity F (LT GRN). Do the backup lamps turn on?  | --  | Go to Step 4  | Go to Step 6  | 
4  | Replace the park/neutral position switch. Refer to Park/Neutral Position Switch Replacement in Automatic Transaxle-4T65-E. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
5  | Repair the open or short to ground in CKT 139 (PNK). Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
6  | Inspect CKT 24 (LT GRN) for an open between S432 and the park/neutral position switch. Refer to Testing for Continuity in Wiring Systems. Is CKT 24 OK?  | --  | Go to Step 7  | Go to Step 8  | 
7  | Repair the open in CKT 1250 (BLK) between S425 and G401. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
8  | Repair the suspect wiring. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
Step  | Action  | Value(s)  | Yes  | No  | 
|---|---|---|---|---|
1  | Did you perform the Backup Lights System Check?  | --  | Go to Step 2  | Go to Backup Lamp System Check  | 
2  | 
 Is the voltage within the specified range?  | 10-15 V  | Go to Step 3  | Go to Step 5  | 
3  | Connect a fused jumper between the park/neutral position switch connector C114 cavity D (PNK) and cavity F (LT GRN). Do the backup lamps turn on?  | --  | Go to Step 4  | Go to Step 6  | 
4  | Replace the park/neutral position switch. Refer to PNP Switch Replacement in Automatic Transaxle-4T80-E. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
5  | Repair the open or short to ground in CKT 139 (PNK). Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
6  | Test CKT 24 (LT GRN) for an open between S432 and the park/neutral position switch. Refer to Testing for Continuity in Wiring Systems. Is CKT 24 OK?  | --  | Go to Step 7  | Go to Step 8  | 
7  | Repair the open in CKT 1250 (BLK) between S425 and G401. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  | 
8  | Repair the suspect wiring. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | Go to Backup Lamp System Check  | --  |