Step  | Action  | Value(s)  | Yes  | No  | ||||
|---|---|---|---|---|---|---|---|---|
1  | Did you perform the RAP system check?  | --  | Go to Step 2  | |||||
2  | 
 Is the voltage within the specified range?  | 10-15 V  | Go to Step 3  | Go to Step 4  | ||||
3  | Measure the voltage between the DAB ACSRY relay terminal C5 and ground. Is the voltage within the specified range?  | 10-15 V  | Go to Step 6  | Go to Step 7  | ||||
4  | Test CKT 1342 (RED) for an open or a short to ground. Is there an open or a short to ground?  | --  | Go to Step 5  | |||||
5  | Repair the open or short to ground. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
6  | Measure the voltage between the DAB ACSRY relay terminal B6 and ground. Is the voltage within the specified range?  | 10-15 V  | Go to Step 9  | Go to Step 10  | ||||
7  | Test CKT 40 (ORN) for an open or a short to ground. Is there an open or short to ground?  | --  | Go to Step 8  | |||||
8  | Repair the open or short to ground in CKT 40. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
9  | 
 Is the voltage within the specified range for approximately 10 minutes, and then open?  | 10-15 V  | Go to Step 15  | Go to Step 18  | ||||
10  | Test the following circuits for an open or a short to ground: 
 
 Is there an open or a short to ground in any of the CKTs?  | --  | Go to Step 11  | Go to Step 12  | ||||
11  | Repair the open or short to ground in the faulty CKT. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
12  | Ensure that the following C202 terminals are clean and tight: 
 
 Are the terminals clean and tight?  | --  | Go to Step 14  | Go to Step 13  | ||||
13  | Repair the faulty terminals. Refer to Connector Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
14  | Replace the ignition switch. Is the repair complete?  | --  | --  | |||||
15  | Ensure that the DAB ACSRY relay terminals are clean and tight. Are the terminals clean and tight?  | --  | Go to Step 17  | Go to Step 16  | ||||
16  | Repair the faulty terminals. Refer to Connector Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
17  | Replace the DAB ACSRY relay. Is the repair complete?  | --  | --  | |||||
18  | 
 Is the voltage within the specified range?  | 10-15 V  | Go to Step 19  | Go to Step 20  | ||||
19  | Measure the voltage between the RFA module connector terminal F15 and terminal F16. Is battery voltage present?  | B+  | Go to Step 22  | Go to Step 23  | ||||
20  | Test CKT 143 (YEL) for an open or a short to ground. Is there an open or a short to ground in CKT 143?  | --  | Go to Step 21  | |||||
21  | Repair the open or the short to ground in CKT 143. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
22  | Measure the voltage between the RFA module connector terminal E16 and terminal F16. Is the voltage within the specified range?  | 10-15 V  | Go to Step 25  | Go to Step 26  | ||||
23  | Test CKT 1050 (BLK) for an open or a short to battery. Is there an open or a short to battery?  | --  | Go to Step 24  | |||||
24  | Repair the open or short to battery in CKT 1050. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
25  | Measure the voltage between the RFA module connector terminal E15 and terminal F16. Is the voltage within the specified range?  | 10-15 V  | Go to Step 28  | Go to Step 29  | ||||
26  | Test CKT 40 (ORN) for an open or short to ground. Is there an open or a short to ground?  | --  | Go to Step 27  | |||||
27  | Repair the open or short to ground in CKT 40. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
28  | 
 Is the resistance inifinite?  | ∞  | Go to Step 31  | Go to Step 34  | ||||
29  | Test CKT 39 (PNK) for an open or a short to ground. Is there an open or a short to ground?  | --  | Go to Step 30  | |||||
30  | Repair the open or short to ground in CKT 39. Refer to Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
31  | Ensure that the RFA terminals are clean and tight. Are the terminals clean and tight?  | --  | Go to Step 33  | Go to Step 32  | ||||
32  | Repair the RFA terminals. Refer to Connector Repairs in Wiring Systems. Is the repair complete?  | --  | --  | |||||
33  | Replace the RFA module. Is the repair complete?  | --  | --  | |||||
34  | Test CKT 49 (DK BLU) and CKT 126 (TAN) and the door switches for a short to ground. Is there a short to ground?  | --  | Go to Step 35  | |||||
35  | Repair Wiring Repairs in Wiring Systems. Is the repair complete?  | --  | --  |